Pper Ring Beam - BWT P-PSC Notice D'installation Et Conseils D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

13.
UPPER RING BEAM
A reinforced concrete upper ring beam should be laid immediately to stabilise and reinforce the pool
structure and to allow the coping to be laid.
Slide reinforcing steel bars through the upper holes in the supporting braces provided for this
purpose (3 or 4 reinforcing bars depending on the panel height).
At the skimmers, pass the rebars over or under the fitting to ensure the continuity of the beam. The
vertical edge of the supporting brace can be used to prop the formwork.
Pour the concrete ring beam, depth 20 cm, 350 kgs/m3. Concrete should be poured in one go with
no rework.
Coping may be laid on a thin layer of screed or on special cement.
47/48
PISCINES P-PSC
2020/05 - Indice de révision : B - Code : 37101

Publicité

Chapitres

Table des Matières
loading

Table des Matières