Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation
Instructions
Questions? Call 800.GE.CARES (800.432.2737) or visit our Website at: www.GEAppliances.com.
BEFORE YOU BEGIN
Read these Instrucitons completely and carfully.
IMPORTANT
for local inspector's use.
IMPORTANT
codes and ordinances.
Note to Installer
instructions with the Consumer.
Note to Consumer
for future reference.
Skill Level
Installation of this vent hood
requires basic mechanical and electrical skills.
Completion time
• Proper installation is the responsibility of the
installer.
• Product failure due to improper installation is
not covered under the Warranty.
CAUTION :
Due to the weight and size of these vent hoods
and to reduce the risk of personal injury or
damage to the product, TWO PEOPLE ARE
REQUIRED FOR PROPER INSTALLATION.
FOR YOUR SAFETY :
Before beginning the installation, switch power
off at service panel and lock the service
disconnecting means to prevent power from
being switched on accidentally. When the service
disconnecting means cannot be locked, securely
fasten a prominent warning device, such as a tag
to the service panel.
Save these instructions
Observe all governing
Be sure to leave these
Keep these instrucitons
1 to 3 hours.
Range Hoods
PRODUCT DIMENSIONS
12"
18"
21"
30" Models
Requires a 30" opening.
12"
18"
21"
36" Models
Requires a 36" opening.
6
29-7/8"
35-7/8"

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Jv966Cv936Cv966

Table des Matières