5.2 Summary of available equipment
5.2.1
Battery test
The battery test is performed in the following manner: every 30 seconds for the first 20 minutes after
commissioning and every 15 minutes after. As soon as a fault is detected, the test is performed every 30
seconds until 20 minutes after the fault disappears.
The impedance measurement test occurs every 4 hours if the mains is present on the power supply and if his
current is < 6A.The impedance limit value is 50 m
5.2.2
Temperature compensation:
A battery voltage compensation system maintains the charge characteristics within the limits specified by the
battery manufacturer across the entire operational temperature range.
5.2.3
Battery low voltage cut-out:
The cut-out threshold is 21,6 V
-
The element causing the cut-out will be in the + position.
-
5.2.4
Battery reverse connection protection
-
At start-up : the battery relays will not close
During operation : the fuse F8 will blow out
-
In order to ensure maximal and durable service, we strongly recommend that your product be maintained
clean and ensure that it is installed in a dry and ventilated location. We shall in no case be liable for damages
associated with improper use or incorrect maintenance of the equipment.
Replacing the original battery with a battery of incorrect type may result in an explosion hazard.
Used batteries must be disposed of in compliance with recycling requirements.
F1 mother board (mains):
Rating – size – breaking capacity
F8 mother board
Rating – size
F1 to F2 'amplifiers board' (2 outputs) :
rating - type – size
Faux1 to Faux3 'controlers' board (3 outputs):
rating - type – size
External battery fuse (not fitted with equipment)
rating - type
.
±10 %
.
±3 %
6 Maintenance
7 Fuse protections
32
2 A Time lag
5x20
1500 A breaking capacity
6,3A T
5x20
20 A gG
10x38
5A F
5x20
[Ibmax (mains not present)] A
gG type