Change Of Size - FAR KJ 45/S Traduction Des Instructions Originales

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 20
KJ 45/S
KJ 45/S
CHANGE OF SIZE (fig. f8-f9-f10-f11)
The riveting tool is supplied with 6 pairs of threaded tie-rods
(A), heads (B), entreiners (R) and, spacers (S) only for tie-
rods from M4 to M6 (f8).
To change the size make as follows:
• Unscrew the cone-carrying head (O) by a 22 mm standard
spanner (f9).
• Extract the threaded tie-rod, pushing and lifting it at the
same time (f10).
• After preparing the threaded tie-rod (A) of the size you
need, arrange and keep the components as shown in f11
and assemble. Be sure that the components are correctly
placed, rotating the tie-rod by hand (f11).
ATTENTION!
• The side of the component (R) to be entered in the head
of the tie-rod is provided of a magnet to avoid accidental
fall during the operations of change of size.
• Screw the cone carrying heads (O) by a 22 mm standard
spanner and clamp correctly.
ATTENTION!
Disconnect the machine before carrying out the
above-mentioned operations.
M4 ÷ M6
A
B
R
S
O
22 mm
Revisione - 04
M8 - M12
A
B
R
GB
f8
f9
Date 01-2012
f10
f11
17

Publicité

Table des Matières
loading

Table des Matières