Locate the Wall Jambs
Position a wall jamb against the wall directly over the bottom track. The wall jamb
should sit flat against the wall.
Slide the wall jamb down over the bottom track until the wall jamb and bottom
track are fully engaged.
NOTE: The wall jamb must sit flat on the bottom ledge. If your ledge has a curve in
the corners at the side wall, it may be necessary to shape the bottom end of the wall
jamb with a file.
Use a level to plumb the wall jamb vertically.
Using the pre-drilled screw holes as a guide, mark the hole locations on the wall.
Repeat the procedures with the second wall jamb.
Remove the bottom track and wall jambs.
NOTE: When installing on ceramic tile, use a center punch to nick the surface of the
glaze. Tap the center punch lightly with a hammer to avoid cracking the tile.
Lightly center punch the hole locations.
Drill a 3/16" hole at each mark. Use a tile or masonry bit for ceramic tile.
Thoroughly clean the shower floor ledge and wall.
Insert plastic anchors in each hole.

Localiser les montants du mur

Positionner le montant du mur contre le mur directement sur le rail inférieur. Le
montant du mur devrait bien reposer à plat contre le mur.
1063221-2-A
Mark each hole location.
Marquer chaque
emplacement d'orifice.
Marque la ubicación de
cada orificio.
Level
Wall Jamb
Niveau à bulle
Montant du mur
Nivel
Jamba mural
Anchor
Ancrage
Anclaje
Masking Tape
Ruban-cache
Cinta de enmascarar
10
Bottom Track
Rail inférieur
Carril inferior