Installation Procedure - Toto TSPTM Manuel D'installation Et D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

CAUTION: RISK OF PERSONAL INJURY.
When this valve is installed, it must be adjusted to minimize the risk of
scalding. The maximum water temperature should never exceed 120°F (49°C).
If Soldering: Excessive heat when soldering can cause damage to internal
valve components. Use caution not to heat the valve more than necessary
to form a good joint. Removal of the valve cartridge and service stops is not
necessary if excessive heat is avoided. Remove plaster guard if necessary.
1. Shut off the main hot and cold water supply.
2. Install the valve so that the port centers are positioned between
1-11/16" and 2-11/16" [43-68 mm] from the finished wall surface.
3. Connect the hot and cold supply lines to the proper ports, marked "H"
and "C". For installation with reversed inlets, refer to page 4.
4. Secure the valve to wall framing or blocking using the two unthreaded
mounting ears.
For shower with tub installation:
See recommended installation dimensions on page 20.
Plumb the valve's bottom port (labeled "TUB") to the tub spout. To ensure
correct operation, the tub spout must be connected to the valve using
1/2" or greater copper tube (12" ± 1" length) and a single 90° elbow.
Do not use PEX or similar materials.
Plumb the valve's top port to the showerhead. The showerhead must
be installed 40" or more above valve center.
For shower only installations:
See recommended installation dimensions on page 20.
Cap the valve's bottom port (labeled "TUB"). 1/2" NPT cap not included.
Plumb the valve's top port to the showerhead.
5. Follow maximum temperature adjustment procedure (page 5).
6. Replace the plaster guard (if removed during installation) on the valve
until finished wall is complete.

INSTALLATION PROCEDURE

3

Publicité

Table des Matières
loading

Table des Matières