Prior To Installation - Mediclinics M092A Manuel D'installation Et D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 32

PRIOR TO INSTALLATION

LOCATION
The Wash & Dry hand dryers from Mediclinics are supplied with 1300mm hose on the
M092A and 1300mm hose on the M093A, then the 'motor unit' must be placed within
the hose length to the 'air unit'.
BASIN/DECK
The used basin or deck shall admit a hand dryer installation according to the present
installation manual.
The baisn/deck must have a minimum depth of 120mm, vertical walls and not so
rounded edges in order to avoid splashes.
SPACING
On the M092A the spacing to the water faucet must be at least 140mm.
On the M093A the spacing to the water faucet must be at least 150mm and has to be
installed at least 120mm above the bottom of the basin.
INSTALLATION
'AIR UNIT' INSTALLATION M092A
Drill a 33-35mm hole on the basin/deck if it is not already drilled.
A – Place the 'air unit' in the hole, inserting the IR sensor wire in advance.
B – Firmly hold the 'air unit' to ensure a correct placement, insert the rubber gasket, the
earth tag and tighten the fixing nut.
C – To move the bezel until the hole is completely covered.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

M093a

Table des Matières