Electrode Winter Break; Coming Season Start-Up Procedures; Peristaltic Hose Replacement - Mareva Premium pH Manuel D'installation Et D'entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

10.2 Electrode winter break

-
Remove the electrode during winter break. Fill in the protection cap with 1/3 of water and put it on
the electrode. It's recommended to install a new electrode every season begin.

11.0 Coming season start-up procedures

- It's recommended to install a new electrode when season begin, in order to prevent failure during season.
- After the electrode replacement or start up of the apparatus, repeat the calibration procedure described at
chapter 9,2.

12.0 Peristaltic hose replacement

22

Publicité

Table des Matières
loading

Table des Matières