General Instructions - T&S B-1200 Série Instructions D'installation Et D'entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

General Instructions

Installation: (B-1200)
1. Turn off water supply and drain
lines. Hand tighten no.20 fi rmly
against no.1 and remove no.21 from
no.1.
7, 8
2. Drill 7/8" hole in sheet metal.
Insert no.1 through hole and screw
no.21 on back of no.1, leaving no.20
free to turn.
3. Apply tefl on tape or pipe joint
compound to threads of water supply
line. Connect no.1 to water supply
line outlet, tightening as far as pos-
sible.
4. Tighten no.20 and no.21 so they
are fl ush against surface of sink back.
5. Turn on water supply and check
for leaks.
Flow Adjustment:
To adjust water fl ow, loosen no.7
with a wrench, then use screwdriver
to turn no.8 to desired setting.
Tighten no.7 when fl ow adjustment
is complete.
20
1
sink back
Installation: (B-1210)
1. Turn off water supply and drain
lines.
2. Unscrew and remove no.31 and
no.30 from no.28. Position no.29 to
cover threads of no.28.
21
3. Place no.28 through 7/8" hole in
countertop. Replace no.30 and no.31
onto no.28 and tighten with a wrench
at bottom side of countertop.
countertop
4. Screw no.1 into no.27 and tighten
fi rmly.
5. Apply tefl on tape or pipe joint
compound to threads of no.28, con-
nect to water supply line inlet.
6. Turn on water supply and check for
leaks.
To adjust water fl ow see fl ow adjust-
ment note for B-1200 model.
7, 8
1
28
29
30
31
27

Publicité

Table des Matières
loading

Table des Matières