Output 1 - Function:
Relay contact 48 VDC/1 A and 240 V AC/2 A
Assigned to thermal disinfection.
☞
Normal functionality: Permanently "ON" for the duration of the thermal disin-
fection process
• Acknowledgement see IN3
Output 2 - Function:
Relay contact 48 VDC/1 A and 240 V AC/2 A
Assigned to thermal disinfection.
☞
Normal functionality: Permanently "ON" when thermal disinfection was aborted
manually.
• Acknowledgement see IN3
Output 3 - Function:
Relay contact 48 VDC/1 A and 240 V AC/2 A
Assigned to thermal disinfection.
☞
Normal functionality: Permanently "ON" when thermal disinfection was aborted
by the system.
• Acknowledgement see IN3
Output 4 - Function:
Relay contact 48 V DC/1 A and 240 V AC/2 A
Assigned to collective fault messaging.
☞
Normal functionality: Permanently "ON" when a fault message is being waved.
• Acknowledgement see IN3
11. Assembly Instructions
☞
When installing several devices, it is essential to ensure an unimpeded flow of
cooling air by maintaining a minimum distance of 15 mm to adjacent parts.
☞
Mount the ECC2 function controller (1) on a rail.
11.1 Snap-lock the lower edge (3) into the rail.
11.2 Push up the ECC2 function controller.
11.3 Snap-lock the upper edge (2) into the rail.
11.4 Connect the system cable (4).
Connecting input and output cables (5)
☞
The maximum cross section of an input/output cable is 1.5 mm².
11.5 Strip off 8 mm of the ends of the input/output cables.
☞
Apply wire-end ferrules to flexible electric cables.
11.6 Connect the input/output cables according to the pin configuration (siehe
- 10 -
Kapitel
9.).