General Instructions - T&S B-0873 Instructions D'installation Et D'entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

General Instructions

Nozzle Installation: B-0873
Note: Nozzle should be installed first.
1. Apply teflon tape or pipe joint
compound to threaded end of no.22.
Screw no.22 into no.1, rotate no.22 to
face front of sink.
22
1
sink
shank
2
3
4
Faucet Installation: B-0873
2. Shut off water supply and drain
lines. Drill (2) two holes into sink or
countertop.
3. Remove no.4, 3, and 2 from no.1
shank, then install no.1 thru holes in
sink, replace no.2, 3, and 4. Tighten
no.3 with a wrench.
4. Connect water supply lines and
check for leaks.
Installation: (Pop-Up Valve)
1. Remove pop-up drain stopper, with
'o'-ring and flange from pop-up
assembly.
2. Remove rod clip, lift rod, rod guide
nut, rubber washer and rod ball
assembly from drain body.
'o'-ring
pop-up drain
stopper
stem
flange
screw
rubber washer
washer
locknut
ball rod
gasket
nut
drain body
3. Insert drain body from bottom of
sink drain hole, reassemble flange to
drain body, tightening as far possible.
flange
drain pipe
drain body
sink base
flange flush with
sink bottom
washer
locknut
4. Slide rubber washer on drain pipe
up against bottom of sink. Tighten
washer and locknut firmly against
base for a tight seal.
lift rod
rod clip
rubber
washer

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

B-0874B-1873B-1874B-2973

Table des Matières