FIXING THE FRAME
If you wish to adjust the height of the frame, proceed
as follows:
• Unfasten the metric screws joining the two columns,
located at the sides of the frame.
• Adjust the frame to the height required, then
replace all the screws removed as above.
• Fix the Fixing Part of the Upper Chimney 26 to the
hanging kit using the 2 screws 12w (M3 x 8).
• Lift up the frame, fit the frame slots onto the screws
up to the slot end positions.
• Tighten the two screws and fasten the other two
screws provided; before locking the screws com-
pletely, it is possible to adjust the frame by turning it,
making sure that the screws do not come out of their
housing in the adjustment slot.
• It is now possible to place and tighten the 4 safety
screws, Proceed as follows:
• drill the ceiling with a 10 mm ø bit taking as refer-
ence the holes of the side parts of the upper chim-
ney fixing part.
• insert the 4 dowels (provided).
• insert the washers (provided) to the screws and
tighten the screws
• The Frame must be securely fastened so as to support
both the weight of the Hood and the stress caused by
occasional axial pressure against the fitted Appli-
ance. After fixing, make sure that the base is stable
even when the Frame is subjected to lateral stress.
• If the Ceiling is not strong enough in the area where
the hood is to be fixed, the Installer must strengthen
the area using suitable plates and counterplates an-
chored to resistant structures.
WARNING: For the Recirculation version only: remove the sticker from
the slots on the upper chimney!
EN
26
1
2
12w
1
2
8 8