Air/Fume Ducts; Service And Maintenance - Ferroli DIVA C24 Instructions D'utilisation, D'installation Et D'entretien

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

DIVA C24 / C28 / C32
Accessing the electrical terminal block
The electrical terminal block can be accessed after removing the casing. The arrangement of the
terminals for the various connections is also given in the wiring diagram in fig. 21.
72
139
fig. 7 - Accessing the terminal block

3.6 Air/fume ducts

The diameter of the flue connection pipe must not be less than that of the connection on
the anti-backflow device. Starting from the anti-backflow device it must have a vertical
section at least 50 cm long. Current standards must be complied with regarding sizing
and installation of the flues and connection pipe.
B
The boiler is also equipped with a safety device (fume thermostat) that stops
operation of unit in case of inadequate draught of obstruction of the flue. This
device must never be tampered with or deactivated.

4. SERVICE AND MAINTENANCE

4.1 Adjustments
Gas conversion
The unit can work on natural gas or LPG and is factory-set for use with one of these two
gases, as clearly shown on the packing and data plate. Whenever a different gas to that
for which the unit is arranged has to be used, the special conversion kit will be required,
proceeding as follows:
1.
Disconnect the power supply ahead of the boiler and close the gas cock;
2.
Replace the nozzles at the main burner and pilot burner, fitting the nozzles indicated
in the technical data table in cap. 5, depending on the type of gas used
3.
Connect the power supply ahead of the boiler and open the gas cock;
4.
Modify the parameter for the type of gas:
put the boiler in standby mode
press the DHW buttons (details 1 and 2 - fig. 1) for 10 seconds: the display
shows "b01" flashing.
press the DHW buttons (details 1 and 2 - fig. 1) to set parameter 00 (for opera-
tion with natural gas) or 01 (for operation with LPG).
press the DHW buttons (details 1 and 2 - fig. 1) for 10 seconds.
the boiler will return to standby mode
5.
Adjust the minimum and maximum pressures at the burner (ref. relevant para-
graph), setting the values given in the technical data table for the type of gas used
6.
Apply the sticker, contained in the conversion kit, near the data plate as proof of the
conversion.
TEST mode activation
Press the heating buttons (detail 3 - fig. 1) together for 5 seconds to activate the TEST
mode. The boiler lights at the maximum heating power set as described in the following
section.
The heating and DHW symbols (fig. 8) flash on the display; the heating power will appear
alongside.
fig. 8 - TEST mode (heating power = 100%)
Press the heating buttons (details 3 and 4 - fig. 1) to increase or decrease the power
(Min.=0%, Max.=100%).
If the TEST mode is activated and enough hot water is drawn to activate the DHW mode,
the boiler remains in TEST mode but the 3-way valve goes to DHW.
To deactivate the TEST mode, press the heating buttons (details 3 and 4 - fig. 1) together
for 5 seconds.
The TEST mode is automatically deactivated in any case after 15 minutes or on stopping
of hot water drawing (if enough hot water has been drawn to activate the DHW mode).
Adjustment of pressure at the burner
Since this unit has flame modulation, there are two fixed pressure values: the minimum
and maximum, which must be those given in the technical data table according to the
type of gas.
Connect a suitable pressure gauge to pressure point "B" located downstream of the gas valve
Remove the protection cap "D" undoing screw "A".
Operate the boiler in TEST mode.
Adjust the power to the max. value.
Adjust the max. pressure with screw "G", clockwise to increase the pressure and
anticlockwise to decrease it
Disconnect one of the two Faston connectors from the modureg "C" on the gas valve.
Adjust the min. pressure with screw "E", clockwise to decrease the pressure and
anticlockwise to increase it.
Reconnect the Faston connector detached from the modureg on the gas valve.
Check that the maximum pressure has not changed.
Refit protection cap "D".
To end the TEST mode repeat the activation sequence or wait 15 minutes.
After checking or adjusting the pressure, make sure to seal the adjust-
A
ment screw with paint or a specific seal.
C
D
E
A - Protection cap screw
B - Pressure point downstream
C - Modureg cable
D - Protection cap
E - Min. pressure adjustment
G - Max. pressure adjustment
Heating power adjustment
To adjust the heating power, switch the boiler to TEST mode (see sec. 4.1). Press the
heating buttons (detail 3 - fig. 1) to increase or decrease the power (min. = 00 - max. =
100). Press the reset button within 5 seconds and the max. power will remain that just
set. Exit TEST mode (see sec. 4.1).
Lighting power adjustment
To adjust the lighting power, switch the boiler to TEST mode (see sec. 4.1). Press the
DHW buttons (detail 1 - fig. 1) to increase or decrease the power (min. = 00 - max. = 60).
Press the reset button within 5 seconds and the lighting power will remain that just set.
Exit TEST mode (see sec. 4.1).
cod. 3541E034 - Rev. 01 - 02/2018
G
fig. 9 - Gas valve
B
C
D
A
13
EN

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Diva c28Diva c32

Table des Matières