dirna Bergstrom bycool green line DINAMIC 1.2 Instructions De Montage page 32

Masquer les pouces Voir aussi pour bycool green line DINAMIC 1.2:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 34
DINAMIC 1.2
EN
ES
Important: Due to the complex system of electronic regulation of the equipment, the current connection
must be made directly to the vehicle battery, and not to any other point which services other accessories
of the vehicle, taking the precaution to not invert the polarity when making the connection (1). Inverting
the polarity may result in irreparable damage to the electronics, which is not covered by the warranty.
Important: Check the User Manual before starting up.
GAS LOAD:
15
Empty the circuit for at least 30 minutes.
16
Introduce 360 g of gas load R134a and start up
the equipment.
17
GENERAL VIEW OF THE CONDENSATION
UNIT AND PIPING.
18
GENERAL VIEW OF THE EVAPORATION
UNIT.
-
+
32
Air conditioning for vehicles

Publicité

Table des Matières
loading

Table des Matières