Installation; Mounting; Opening The Device/Electrical Connection - CEAG GHG 522 44 Mode D'emploi

Fiches et prises de 32 a
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Fig. 4
Item 2
Fig. 5
View 2
L2
L1
PE
Item 1
Item 2
Item 2
Item 1
Fig. 6
Item 2
Item 3
Fig. 7
Item 2
Item 1
Fig. 8
Item 2
Item 1
Plug and socket system 32A, GHG 522
For the operation, the instructions stated in
Item 1
section 7 of the operating instructions will
have to be observed.
Item 3
In the open air, the plugs must be kept with
the plug opening (pin side) pointing
downwards or be closed with protective plug
caps available as an optional extra (see
general catalogue).
View 1
L3
6

Installation

For the mounting and operation, the
respective national regulations (e. g. ElexV,
N
equipment safety law for Germany) as well as
the general rules of engineering will have to be
observed.
6.1

Mounting

The wall sockets can be mounted without
opening their enclosure.
In case the wall sockets are mounted directly
onto the wall, they may rest evenly only at the
respective fastening points. The chosen screw
shall match the fastening hole (see dimensio-
Item 3
nal drawing) and it must not damage the hole
(e. g. use of a washer). The device shall be
fastened diagonally with at least 2 screws.
Item 1
The wall sockets and flange sockets shall
be mounted so that the plug hole does not
point upwards.
The wall sockets can be clipped onto the
CCH mounting plate size 5. They are laterally
pushed into the guiding groove on the left-
hand side of the mounting plate.
The respective mounting instructions will have
to be observed.
Item 4
wall socket 32A with switch
A
A
A
A
Fastening point A
6.2
Opening the device/
Electrical connection
The electrical connection of the device may
only be carried out by skilled staff.
The insulation of the conductors shall
reach up to the terminal. The conductor
itself shall not be damaged.
Taking into account the respective regulations,
the properly bared conductors of the cables
shall be connected.
The electrical connection of the plugs is
established as shown in fig. 4 and 5:
The plug insert (item 2, fig. 5) is removed from
the pin bushing (item 1, fig. 5), after the
fastening screws (item 3, fig. 4) have been
unscrewed. Thereafter, the plug insert can be
connected to the connections of the plug pins
(see view 1, fig. 5).
Attention: When the fastening screws (item
3, fig. 4) get lost, they will have to be
replaced by similar screws or to be ordered
directly from the manufacturer.
Assembly is made in inverse order, after the
cable has been connected.
The inlets are electrically connected as shown
in fig. 6 thru 8.
Fig. 6: After unscrewing the two screws item
3, the plug insert item 2 is removed from the
flange item 2.
Fig. 7: Now the connecting leads item 4 can
be connected to the terminals of the plug
insert item 2 as described in point 6.2.
Fig. 8: Finally, using the self-cutting screws
item 3, the plug insert item 2 is screwed into
the flange, observing its proper position.
The connectible min. and max. conductor
cross-sections shall be observed (see
technical data).
All screws and/or nuts of the supply terminals,
also of those remaining vacant, shall be
tightened down.
The supply terminals are designed for the
connection of copper conductors. If multi- or
fine-wire connecting cables are used, the wire
ends will have to be handled in acc. with the
applicable national and international rules (e.g.
use of sleeves for strands).
Cooper Crouse-Hinds GmbH
9 9 9 9 9

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ghg 522 74

Table des Matières