11.9 Mark the other drill holes.
11.10 Remove the stainless steel housing.
11.11 Drill according to the markings.
Insert the dowels.
11.12 Strip the shielding (a) off from the system lines (approx. 40 mm).
11.13 Fit the union nut (c) on to the system line (b) up to the stop.
☞
The cable cores are marked with numbers 1 through 4.
A: Union nut
B: FAR Order No. 84-032-12.468
FAR Order No. 84-032-12.534
FAR Order No. 84-032-12.563
FAR Order No. 84-032-12.720
A
1
brown
2
white
3
blue
4
black
11.14 Latch the cable cores (d) into the cable core guides (e) according to their colours.
11.15 Cut off the protruding ends of the cable core so that they are flush, i. e. so that they do
not protrude.
11.16 Place the union nut (c) on the electronic T-junction (f) and tighten with the required
torque (1.2 Nm).
Caution!
Ensure correct polarity.
Each core cable colour must be in the same cable core guide on both union nuts.
☞
When the union nut is being tightened, an electric contact and the pull-relief are
automatically established.
Special seals provide protection against dust and water.
11.17 Install the line connections between the electronic module, the solenoid-valve
cartridges and the Piezo-button.
A: Solenoid valve cartridge, mixed water (Actuator 1)
B: Solenoid valve cartridge bypass, thermal disinfection (Actuator 2, optional)
C: Analogue output 0-10 V
D: Temperature sensor, cold water (optional)
E: Temperature sensor, hot water (optional)
F: AQUAPAY coin-operated switch (optional)
G: Piezo-button
H: Electric T-junction system lines (Power)
K: Electronic module
11.18 Only when the water connection is from the rear: Bring forward work steps 11.20 to
11.22.
11.19 Hook the stainless steel housing into the hook-in strip and fasten with screws.
8
B
red
white
blue
black