GRE MARBELLA Notice De Montage page 61

Masquer les pouces Voir aussi pour MARBELLA:
Table des Matières

Publicité

ASSEMBLY OF THE COLUMNS
1
• Assemble 2 columns with parts 1PV1185 + 1 PG + 4 PEAO + 2PEU2 using the TV bolts.
NOTE: THE NUTS SHOULD ALWAYS BE LOCATED ON THE INSIDE. THE ENTIRE PROCESS SHOULD BE
CARRIED OUT ON FIRM AND LEVEL GROUND, BEFORE EXCAVATING THE FOUNDATIONS. WE RECOMMEND
ASSEMBLING THE PARTS IN A LARGE AND LEVEL SPACE, TO MAKE IT EASIER.
• Place the part PEU2 so that the four open holes on the sides with the second and third line of holes of the PG (see
1
diagram 1b) and that the side where the holes are rests on the upper part. Bolt the TV bolts when the PEAO parts have
been installed.
• Bolt the two PEAO parts on each side of the PG crossbar, using the TV bolts and a spanner no. 13.
2
• Place the other PEU2 part on the lower part of the PV1185. Fix the column PV1185 to the PG beam bolt the TV bolts
3
across the PEAO.
1x
PEAO
=
1 PV1185 + 1 PG + 4 PEAO + 2 PEU2 + 1PEU
(8 screws)
PV
PEU
61
2
3
PEU2
Ref. KPBRC420

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

RosemaryMango790096Kpbrc420Kpbrc620

Table des Matières