Disassemble The Refrigeration System - Arneg SR2 Manuel D'installation Et De Service

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

SR2-SR3
English
17.2. Maintenance
Check
tightening torque of terminal block screws
malfunctions, noise, vibrations
tighten the bolts
operation of vibration sampers
intake pressure
temperature of input gas
oil level
oil acidity (run the test)
state of humidity level gauge
state of liquid line filters
for each compressor:
- compression end temperature
- supply pressure
- oil pump operation
- differential pressure switch operation
- for oil level
- power consumption
- crankcase heater
17.3. Cleaning - general directions
Every three months clean the refrigeration system by removing dust, spiderwebs, etc.
Once you have completed maintenance and cleaning proceed as follows:
check that the parts are not damaged or worn
clean the capacitor (remote) (Fig. 13) every 30 days using brushes with rigid bristles (non
metallic) or a vacuum cleaner
replace worn parts with new ones provided by the manufacturer
restore electrical power supply.
ATTENTION! Slippery floor. Falling.
Remove from the floor any element such as cloths, water or detergent residues.
DO NOT damage or fold the fins of the capacitor
carefully remove any detergent residues

18. Disassemble the refrigeration system

i
This refrigeration system contains 75% of recyclable materials.
Preparazione
Obligations
i
Liability
the user must consign the refrigeration system to be disposed of, to the
waste disposal centre specified by the local Body or the manufacturer, for
recovering and recycling the materials.
40
recover the coolant
remove the lubricating oil.
dispose of the refrigeration system in compliance with the regulations in
force on waste disposal effective in every country and in full respect of the
surrounding environment
according to the Laws in force, this refrigeration system is considered a
hazardous waste and must be disposed of separately, as it cannot be
handled as municipal waste nor handed over to regular waste plants.
consign the intact parts of the refrigeration circuit to specialised
refrigerant recycling centres
all the above operations such as transport and waste disposal must be
performed exclusively by specialised authorised technical staff.
Frequency
every 6 months
05060162 00 02/02/2016

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Sr3

Table des Matières