Installation - Hach SIP 10 Instructions D'utilisation

Table des Matières

Publicité

Figure 2 Product components
1 SIP 10 sipper unit
®
2 Tygon
tubing, 1.70 m (5.6 ft)
3 USB cable, type AB, 1 m (3.3 ft)

Installation

Install the flow-thru head
Pre-requisite: Clean the process vial. Refer to
Do not to touch or scratch the glass of the process vial. Contamination or scratches on the glass can cause
measurement errors.
Install the flow-thru head as shown in the illustrated steps that follow.
1
Remove before installation.
6 English
4 Flow-thru head
5 Vial replacement tool
Clean the vial
on page 10.
N O T I C E
1

Publicité

Chapitres

Table des Matières
loading

Table des Matières