Installation; Heat Generator Plate; Boiler Fixing; Probe And Electrode Positioning - Riello RX 120 S/PV Manuel D'entretien

Brûleurs de gaz pré-mélangé
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3.

INSTALLATION

THE BURNER MUST BE INSTALLED IN CONFORMITY WITH LEGISLATION AND LOCAL STANDARDS.

3.1 HEAT GENERATOR PLATE

Make holes in the plate shutting off the combustion chamber as illu-
strated in fig. 2. The position of the threaded holes may be marked
using the gasket joint supplied with the burner.

3.2 BOILER FIXING,

To install, proceed as follows:
Fasten the burner (1) to the boiler's door (2) by means of the four
screws and (where necessary) the nuts supplied, placing the insula-
ting gasket (3) between the two.

3.3 PROBE AND ELECTRODE POSITIONING,

WARNING
Before installing the burner on the boiler, make sure the probe and electrode are positioned correctly as in Fig. 4.
Do not turn the electrode: position it as illustrated. Placing the electrode near the ionization probe may result in the
control box amplifier being damaged.
Fig. 4
D7507
3328
(see fig. 3)
2
1 7 5
Electrode
Probe
3
D9767
(see fig. 4)
4
GB
Fig. 2
1 5 0
Fig. 3
1
4 . 5 - 5 . 5
D7505

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

904t

Table des Matières