Mechanical Installation - Hach PAT700 Manuel D'utilisation De Base

Masquer les pouces Voir aussi pour PAT700:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 29
Multiple hazards. Only qualified personnel must conduct the tasks described in this section of the
document.
To prevent measurement error, make sure that the instrument is attached in an upright, level position.
For environmental and sample requirements, refer to
• Put the instrument in a location that has access for operation, service and calibration.
• Install the instrument near the water system sample point.
• Make sure that there is a minimum of 30.48 cm (12 in.) of clearance for the enclosure doors to
open. Refer to
Figure 2
• Make sure that there is sufficient clearance to access the power switch, plumbing and electrical
connections on the end panels. Refer to

Mechanical installation

Attach the instrument to a wall
Personal injury hazard. Make sure that the wall mounting is able to hold 4 times the weight of the
equipment.
Install the instrument on a wall or other stable, flat surface. Refer to
Figure 3
for installation.
• Use user-supplied 8-mm (5/16-in.) diameter screws or bolts and nuts to attach the instrument to a
wall or other flat, rigid surface. Use hardware that is approved for a process environment.
• Do not attach bolts to separate girders, beams or wall studs that can move independently.
• Do not attach the instrument to a surface that has vibration.
8 English
W A R N I N G
N O T I C E
on page 9.
Figure 2
W A R N I N G
Specifications
on page 3.
on page 9.
Figure 2
for dimensions. Refer to

Publicité

Table des Matières
loading

Table des Matières