Commissioning And Operation - Aventics ED05 Rail Notice D'instruction

Régulateur de pression
Masquer les pouces Voir aussi pour ED05 Rail:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

AVENTICS | ED05 | R414010201–BAL–001–AA | English
Integrated XPC plug, M12 plug,
male, 5-pin
Plug
Pin
1
4
3
2
5
3
4
1
2
00125293
5
O Make sure before connecting the plugs that all seals
and caps are included and not damaged.
O Only use tested plugs and cables.
O Protect the supply voltage with an external M 2.0 A
fuse
O Use a shielded cable to connect the XPC.
The shield must be connected to the plug housing.
O Connect the cable at the integrated XPC (7) plug. The
ED05 pressure regulator can now be supplied with
voltage and controlled with a set point.
7
Commissioning and
Operation
Defective seals or leaky connections
Liquids and foreign objects could penetrate the device
and plug connections and destroy the electronics.
O Before commissioning, make sure that all seals and
plugs are leaktight.
O Never open the device.
Malfunction due to atmosphere containing oil!
Oil may clog the housing ventilation port. This will
change the characteristic curve.
O Never operate the device in an atmosphere
containing oil.
Function
24 V DC supply voltage
Set point (+):
Current: 0/4 ... 20 mA or
Voltage: 0 ... 10 V DC
0 V
Actual value (+):
Current: 0/4 ... 20 mA or
voltage: 0 ... 10 V DC or
Switch output: 24 V
FE
NOTICE
Switching on the pneumatic and
electrical supplies
Danger of destruction to connected devices if switched
on in the wrong order
If the valve is first connected to the electric supply and
then the pneumatic supply, overshooting may cause the
pressure in the working line to reach a level that is
much higher than the set pressure. The pressure in the
working line may even reach the level of the supply
pressure before the adjusted pressure is reached.
O Make sure that the connected devices are resistant
to the max. supply pressure.
O Always comply with the order for switching on the
devices.
Connected devices may be destroyed due to process-
related leaks.
If switched on in the proper order, the device is first
connected to the pneumatic supply and then the electric
supply. If the device has not yet been connected to the
electric supply, contamination may cause the poppet
valve to leak, causing the pressure in the working line to
reach the level of the supply pressure.
O Make sure that the connected devices are resistant
to the max. supply pressure.
Commissioning the ED05 pressure regulator
1. Switching on pneumatic supply.
2. Switching on the 24-V-DC supply voltage.