Preparation For Installation Of Bracket/Wall Levelling Section/Angle Bracket - Hansgrohe PHARO Duschtempel 100 Quadra ML40L 29 36 Série Instructions De Montage

Table des Matières

Publicité

Wiring conduit clear inner diameter 25 mm transformer cable
m )
0 m
- 2
+ /
m (
y
t r a
0 m
e r
0 4
o w
e 2
f s h
n g l
e o
n a
e d g
a t i o
e r
t a l l
p p
I n s
m u
f r o
a s
Drill holes for
bracket:
1. Using the water level
6 0
continue 37 mm marking
1 6
vertically towards the top.
S 6
2. Draw drill holes at
indicated markings as from
upper edge of shower
tray edge.
3. Drill holes, insert
4 dowels S6.
7 0
1 1
S 6
0
6 8
S 6
0
1 9
S 6
(For left door hinge, position
bracket on right wall and wall
levelling section on left wall).
Preparation for Installation of Bracket/
Tie-Bar Angle Bracket (Door with Right Hinge)
*
Wiring conduit level 2040 mm (+/- 20 mm)
S 1
0
S 1
0
Drill holes for
wall levelling section:
1. Set wall levelling section at
middle of hole on marking
of shower tray edge.
Align with water level.
2. Draw drill
holes through
screw holes.
3. Drill holes, insert
4 dowels S6.
* not at shower temple 29 42x xxx and 29 43x xxx
Wall Levelling Section/
S 6
S 6
S 6
S 6
*
25

Publicité

Table des Matières
loading

Table des Matières