Installing Your Unit; Unpacking Your Unit; Leveling Your Unit; Proper Air Circulation - Haier HVFE040BBB Guide De L'utilisateur

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

English

Installing Your Unit

Unpacking Your unit

1. Remove all packaging material. This includes the foam base and all
adhesive tape holding the unit accessories inside and outside.
2. Inspect and remove any remains of packing, tape or printed
materials before powering on the unit.

Leveling Your unit

• Your unit has four leveling legs which are located in the front and
rear corners of your unit. After properly placing your unit in its final
position, you can level your unit.
• Leveling legs can be adjusted by turning them clockwise to lower your
unit or by turning them counterclockwise to raise your unit. The unit
door will close easier when the leveling legs are extended.

Proper Air Circulation

• To assure your unit works at the maximum efficiency it was designed
for, you should install it in a location where there is proper air
circulation, plumbing and electrical connections.
• The following are recommended clearances around the unit:
Sides...............2" (50mm)
Top....................2" (50mm)
Back..................2" (50mm)
• Do not over fill your unit for proper wine cooling.
Note: If your unit has been tilted for any reason, wait 24 hours
4
before plugging it in.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Hbcw100abb

Table des Matières