SMART, SAFE & FAST CHARGING
PLEASE CHECK THE PACKAGE
CONTENTS ON RECEIPT
Package contents
Charge point
Wall bracket
Rubber grommets (various sizes)
1 x M4 x 20 mm bolt (Torx)
6 x M4 x 12 mm bolts (Torx)
4 x M8 x 12 mm bolts (Torx) and washers
4 x M8 x 35 mm bolts (DIN 912) and washers
2 x plastic spacers
Sticker sheet for the sides of the charge point
GPRS signal (dBm) reception
The Vodafone GPRS signal strength (2G) must be
between -56 and -80 dBm (turn off 3G or 4G reception
on your mobile phone if you use it to check the signal).
At weaker signal, please contact NewMotion.
Space in distribution box
There needs to be sufficient room in the distribution board
to add any necessary circuit(s).
SAFETY
The electrical system must be voltage-free during
the entire installation procedure.
The installation procedure must be carried out by
a trained electrician who works in accordance with
the relevant laws and regulations.
Do not carry out installation work in rain or when
the humidity is above 95%.
INSTALLATION INSTRUCTION – P1
REQUIRED MATERIALS
AND TOOLS
General
Charge point
Rubber grommets (provided)
1 x M4 x 20 mm bolt (Torx) (provided)
6 x M4 x 12 mm bolts (Torx) (provided)
Power cable (see 'Installation specifications')
Cross-head screwdriver (Pozidriv size 1)
Torx screwdrivers (T20 and T45)
Voltage tester
Spirit level
Tape measure
Dynamic Load Balancing
Activation of Dynamic Load Balancing can only be done
on location by New Motion or certified partners. If this
is the case the charge points need to be interconnected via
a UTP cable to enable the mutual communication required
for Dynamic Load Balancing.
The network configuration can be done via daisychain
or star configuration using a switch (not provided).
Without Dynamic Load Balancing the charge point will
function as stand alone charge point and cannot share
the available power.
UTP cable (CAT5 or CAT6)
RJ45 connectors
Crimping tool (RJ45)
To attach the charge point to the wall bracket
Wall bracket (provided)
2 x M8 x 12 mm bolts (Torx) and washers (provided)
3 x screws, at least 6.3 x 60/70 mm with washers and plugs
Drill and bit
To attach the charge point to the pole in soil
Pole and concrete base
4 x M8 x 12 mm bolts (Torx) and washers (provided)
4 x M8 x 35 mm bolts (DIN 912) and washers (provided)
DIN screwdriver (912)
Shovel
To attach the charge point to a pole in concrete
Pole
4 x M8 x 12 mm bolts (Torx) and washers (provided)
4 x wedge bolts and 4 x M8 nuts
Drill and bit

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Business pro 22Business lite et pro 0400 série

Table des Matières