5. Place the splash ring on the bowl,
making sure the tabs on the bowl fit
into the recesses in the splash ring,
and turn counterclockwise, see figure
5a. Then place the cover on the
splash ring so that the tabs on the
splash ring fit into the recesses in the
bowl cover and turn the cover
counterclockwise to fasten the bowl
cover to the bowl. See figure 5b.
The splash ring and cover should be in
place whenever the power unit is in
operation. The splash ring and cover
serve to prevent the escape of flour
dust at the beginning of the stirring and
kneading process, and also serves to
prevent accidental contact with the
moving whisks.
Placing into Operation Twin Beating
Whisks
Make sure that the switch is in the Off
position, "0/off". Unwind the electrical cord
to the necessary length and plug into the
wall outlet. The bowl with whisk assembly is
now ready for operation.
See table 1 for examples demonstrating the
use of the twin beating whisks.
15