Bradley On-Site S19-921 Consignes D'installation page 4

Douche oculaire à gravité avec bande chauffante facultative
Masquer les pouces Voir aussi pour On-Site S19-921:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

S19-921, S19-921H, S19-921HR
Installation
Step 1: Mount eye wash pedestal to wall (optional)
CAUTION: Eye wash station weighs 60 lbs when filled to capacity. Assistance from
1. To mount the pedestal to the wall, follow the procedure
outlined below:
• Secure the mounting bracket to the wall with screws and
wall anchors (provided by installer).
• Attach the pedestal to the mounting bracket at the handles
on the back of the unit (see Figure 1).
NOTE: When mounting the eye wash unit to the mounting
bracket, make sure the unit is level and the sprayheads are at
a height of 33-45" from the floor and situated at least 6"
from the wall or nearest obstruction (ANSI Z358.1-2004).
Step 2: Fill and mount tank
1. Pour clean, potable room temperature water
into the tank; continue pouring until the tank
is 1/3 to 1/2 full.
2. Pour entire contents of the water preservative
bottle (supplied) into the eye wash tank.
3. Add clean, potable room temperature water to
the tank until the water level reaches the fill
line.
4. Insert one liner into the cap (with hole) and
attach the cap to the top of the tank (see
Figure 2a).
5. OPTIONAL HEATER JACKET: Place the
pedestal into the heater jacket. For ease of
tank installation, loosen the jacket around the pedestal. Insert the tube from the drain hole at the
bottom of the pedestal through the hole in the back of the heater jacket. Drain hole location is shown
in Figure 2b on page 5.
NOTE FOR TANK INSTALLATION: To ensure proper installation, the tank should be placed on the
pedestal from the front of the unit.
6. Invert the tank and place it on top of the pedestal as shown in Figure 2b found on page 5. A slight
adjustment to the position of the tank may be required for proper placement of the tank on the
pedestal. The pierce on the pedestal will puncture a hole in the cap liner and allow solution to flow.
7. Raise the arm to snap fit in an upright position.
8. Secure the tank to the pedestal using the side tank clamps. Make sure the latches are pulled down tight
to the pedestal (see Figure 2b, page 5).
9. OPTIONAL HEATER JACKET: Insert the 5-pin connector into the mating socket on the junction box
and screw tight. Slide the heater jacket up to cover the tank and secure the jacket with the hook-and-
loop fasteners. Slide the arm into pocket of the jacket flap.
NOTE: After the tank is mounted to the pedestal, minor spillage could occur. Allow the fluid to stabilize
completely before inspecting the unit for leaks.
4
another individual may be required to safely install the unit. Mounting bracket
screws and wall anchors must be strong
enough to support the filled unit.
9/12/07
CAP WITH HOLE
LINER
(insert liner into cap before
attaching cap to tank)
TANK
Figure 2a
Bradley Corporation • 215-1546 Rev. C; ECN 07-525
Installation
Figure 1
WALL
BRACKET
Turn cap to close

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

On-site s19-921hOn-site s19-921hr

Table des Matières