2.2.1. Assembly of the Control Box
The control box can be fitted directly to the reactor by means of the supplied faste-
ning bands.
• Assembly on the wall is also possible. For this method drill two holes
(hole spacing 134 mm) and fit dowels and screws. Then the control
housing can be hung on the screws.
• In the case of wall mounting the lengths of the supplied cables are to be taken
into account
» Connecting line to the mains:
» Sensor cable:
» Lamp cable :
» Solenoid valve cable:
The supplied cables must not be shortened or lengthened!
2.2.2. Electrical Connection
When the control box is connected to the mains make sure to
observe the valid national regulations as well as the indications
on the type plate (supply voltage, frequency, etc). The unit shall
only be operated with power lines including a ground wire (PE).
Installation work is to be carried out only by qualified elec-
tricians. Make sure to remove mains plug from socket before
carrying out work at the unit.
The grounding cable (earth) is to be connected to the reactor!
Do not open the housing of the control unit, otherwise the gua-
rantee will become void!
12
Pull bands through the opening
of the housing and fasten them
to the reactor.
200 cm
150 cm (only for Maxima)
150 cm
150 cm (optional)