5.
Check the rivets
Check that the rivets are held behind the smaller hole of the
support beam keyholes. Repeat steps 4 and 5 for each tie
channel support.
7.
Add wire shelves
P1
P3
Place the wire shelf (P1) on top of the tie channel supports (P3)
for each shelf. Make sure that the long rods of wire shelves are
at the bottom.
9.
Configure shelving
Two or more racks of the same height and depth can be
connected by sharing the same welded-end frame (P4)
between them.
NOTE: Ensure there are at least two shelves per rack between
each set of welded-end frames (P4).
P 3
A
Smaller
hole
P2
P3
P4
6.
Check all beams and tie channels
P3
Verify that all support beams (P2) and tie channel supports
(P3) are properly assembled and firmly seated into the top and
bottom post slots.
8.
Move shelving
Use two or more people to move the rack shelving to its final
location.
P2
7