KS Tools 160.0015 Notice D'utilisation page 7

Grue mobile pliante
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4. Assembly
NOTE: During the assembly procedure, nuts and bolts should be hand tightened only. Once assembly is complete,
nuts and bolts may be fully tightened.
1. Attach the castor wheels (No.27) to the base using the nuts and bolts supplied.
2. Referring to the spare parts drawing, insert the left hand leg (No.2) into the base (No. 1) and lock the leg in place
using two locking pins (No.4). Secure these in place using two split type pins. Now repeat this procedure for the
right hand leg.
3. Attach the main support post (No.8) to the base assembly (No. 1) using five bolts (No. 9) and five washers and nuts
(No.10).
4. Now secure the boom (No. 11) to the main support post (No.8) using bolt (No.12) washer (No. 13) and nut (No.14).
5. Next the ram unit (No.15) should be attached to the main support post (No.8) using bolt (No.16). nut and washer
(No. 17). Then secure the ram unit to the boom using bolt (No. 18) nut and washer (No. 17).
6. Insert the boom extension (No.22) into the main boom (No. 11), secure in one of the four positions using bolt
(No. 9), nut and washer (No. 9 and 10).
7. Attach the hook and chain assembly (No. 24) to the boom using nut, bolt and washer (No. 23 and 10).
8. Secure handle (No.19) to the main support post (No.8) using four bolts (No.21) und four washers (No.20).
9. Now tighten all nuts and bolts.
5. Operating instructions
WARNING:
This double pump long ram is designed for lifting purposes only. Not for supporting loads. Do not load
beyond its rated capacity.
IMPORTANT: It is possible that air has got into the hydraulic system, causing poor lifting performance. Purge any air
from the system by fully opening release valve, (turn handle counterclockwise as shown), then while
holding the boom down, operate pump handle rapidly several times.
5.1 To raise load
Close release valve by turning handle CLOCKWISE to a SNUG-TIGHT position. (DO NOT OVER TIGHTEN).
5.2 To lower load
Open release valve by turning handle COUNTERCLOCKWISE very slowly. The speed of lowering the load is
controlled by how much you turn the handle.
6. Pump ram specifications
Capacity ton Min. Height
inch
3
26.1/2
NOTE: Before raising the legs to the storage position, bolt (No. 6) and nut (No.7) must be inserted into the base
support and tightened each time. If this procedure is not followed the unit may fall over.
Max. Height
Overall
inch
Width inch
45.7/8
5.1/8
Overall
Handle
Length inch
Length inch
26.3/8
23.1/2
Net Weight
Power Lift
lbs
inch
26.5
19.1/2

Publicité

Table des Matières
loading

Table des Matières