3
4
5
The parts are required to meet the latest RoHS directive.
L B
PLASTIC TIE
PLASTIC TUBE
9
10
Model
SVZ-KP12, 18, 24
3
4
SVZ-KP30, 36
5
Reinstall the coil assembly along with bracket(s) that secure(s) it. Failure to reinstall the brackets will result
in capacity loss and condensation formation inside the cabinet. Reconnect the waterproof connector inside
the coil section. Refer to 10.3. Step 1 to 3 in reverse order to reassemble the panels. Ensure the proper
knockouts are removed for drainage and electrical connections.
Specifications are subject to change without notice.
6
7
8
CORRECT
5/8"
(15mm)
MITSUBISHI ELECTRIC CORPORATION
DATE
DIM.mm
DRAWN
SCALE
0.200
CHECKED
NTS
DESIGNED
11
12
13
Tube Length
4.9 in. (125 mm)
6
7
6.9 in. (175 mm)
8
DETAIL A
NOTE
For Horizontal installation an auxiliary drain pan must be installed.
9
10
11
12
SVZ-KP12,18, 24, 30, 36NA
①
②
③
INCORRECT
ITEM
MODEL NAME
PLASTIC TIE
COMMERCIAL TOLERANCE
WORK
GRADE
CASTING
FINE COARSE
PRESS WORKING
A
D
GAS CUTTING
A
PLASTIC TUBE
SHEARING
A
MACHINING
MEDIUMCOARSE
3D
CONFIDENTIAL
APPROVED
14
15
16
9
10
11
12
21
13
14
15
D
① DETAIL A
② Secure with plastic ties 2 per
E
side
③ 2 Plastic tubes ensure tubes
drain into pan
DETAIL B
F
G
H
I
B
C
E
B
B
J
2
MITSUBISHI ELECTRIC CORPORATION
3D
DIM.mm
DATE
APPROVED
DRAWN
SCALE
0.200
CHECKED
NTS
DESIGNED
13
14
15
© 2020 Mitsubishi Electric US, Inc.
16
A
B
C
D
E
F
G
H
ITEM
MODEL NAME
COMMERCIAL TOLERANCE
WORK
GRADE
I
CASTING
FINE COARSE
PRESS WORKING
A
B
C
D
E
GAS CUTTING
A
B
SHEARING
A
B
MACHINING
MEDIUMCOARSE
CONFIDENTIAL
J
18
16