STEP 4B - SURFACE MOUNT INSTALLATION
1. With the electrical cover(s) removed, feed the field wire(s) through the field wire strain relief(s) at the back of the electrical
enclosure(s).
Note: Refer to your cabinet's Instructions to insure there are no additional assembly steps required prior to proceeding.
2. Mount the cabinet in place following the steps provided in the cabinet's instructions.
3. Make the electrical connection(s) according to the electrical diagram on page 7.
30 = 16-1/2" (419 mm)
36 = 22-1/2" (572 mm)
40 = 25-7/8 (657 mm)
Left Hand (LH) electrical
enclosure installation
field wire stub out
© 2020 Robern, Inc. 701 N. Wilson Ave. Bristol, PA 19007 U.S.A.
800.877.2376
www.robern.com
Installation or Assembly Instructions
All manuals and user guides at all-guides.com
Cabinet Width + 3/4"
C L
9
30 = 24-3/4" (629 mm)
36 = 30-3/4" (781 mm)
40 = 34-1/8 (867 mm)
Right Hand (RH) electrical
enclosure installation
field wire stub out
1
Part no. 209-1329 rev. 03/25/20
Vesper Midline / Outline Light