Télécharger Imprimer la page

Wohler TA 200 Mode D'emploi page 35

Publicité

5.1
Batteries
5.2
Alignment of the probe
in the pipe
Fig. 15: Leakage detection on the win-
dow frame
Insert 4 AAA 1.5 V batteries.
The battery compartment is located on the back of
the device.
When the battery voltage is low, a battery symbol
appears on the left-hand side of the display.
In this case, insert new batteries.
To carry out a flow measurement, remove the
protective cap from the probe tip.
Pull the telescopic rod to the required length
NOTE!
To measure in the pipe, straighten the gooseneck
of the probe head.
For leakage detection, e.g. on a window or
door frame, align the gooseneck of the probe
head individually.
Preparation for operation
35

Publicité

loading