Télécharger Imprimer la page

Burcam 506522SS Instructions D'installation page 4

Publicité

Cut the desired length of poly pipe to run from the top of the well to the
STEP 2
pumping level. Smooth the pipe cuttings with your round file. (Check that no
cut-out parts are left inside of pipe. This may block pump injector or impeller).
Tape male adaptor threads with teflon tape and thread adaptor into the
foot valve. Slide 2 stainless steel clamps over one end of pipe and use
torch to soften pipe. Insert the male adaptor and foot valve into this pipe
end. Tighten clamps with screwdriver. For security against leaks, we
suggest to install 2 stainless steel clamps on each adaptor.
Insert the well seal elbow thru the opening of the seal.
STEP 3
Slide 2 stainless steel clamps over the free end of the previously cut pipe
and soften pipe with your torch. Attach pipe to the well seal elbow
(end protruding at bottom of well seal). Tighten clamps with screwdriver
when cool.
Install the well seal and piping assembly into your well casing. Tight down
STEP 4
the seal bolts using your adjustable wrench.
To facilitate servicing at a later date, you may use a pitless adaptor and a
sealed well cap instead of an elbow and a well seal as described in steps
3 and 4.
Install your pump in the house, on a sound foundation, as close as possible
STEP 5
to the basement wall. Thread an adaptor into inlet using teflon tape. Do
not over tighten.
Cut the desired length of pipe from pump location to the well seal and
STEP 6
connect both ends using the previous way, with stainless steel clamps and
torch. Before connecting your pipe to the pump, fill the suction line with water.
Do not fill in your trench to the house until you have checked for any
leaks in your connections or trouble in your water system.
Sand or well points are limited to areas where water bearing sand or
STEP 7
gravel lies below the surface, and where there are no boulders or rocks to
for sand
interfere with the driving into the ground of the point.
or well
The amount of water any ''one'' well point will supply is usally rather
limited. Sometimes, it is necessary to use more than one point to increase
point
the supply of water entering to the pump's suction.
THE IMPORTANT INSTALLATION STEP IN USING WELL POINTS IS THAT
A CHECK VALVE MUST BE USED IN THE SUCTION PIPE LEADING TO THE
SUCTION INLET, AS CLOSE TO THE PUMP AS POSSIBLE, TO KEEP LINE AND
PUMP WELL PRIMED.
4
SHALLOW WELL APPLICATION
SEE DIAGRAM ON PAGE 7
CONTINUE ON PAGE 5 & 6 FOR TANKS
AND ELECTRICAL INSTALLATION STEPS.

Publicité

loading