Télécharger Imprimer la page

Dacor DRW24G7500 Serie Instructions D'installation page 33

Appareil de réfrigération sous plan

Publicité

How to install the integrated panel
1. Fully open the door.
2. Starting at the corner, pull the gasket away from door as in Fig A.
3. Continue to pull the gasket free from the gasket channel.
4. Upon removal, lay the gasket down on a flat surface.
5. Secure the integrated panel to the door using clamps as in Fig. B. Durable tape may
also be used. Bar clamps may be used to secure the panel to the door. If using tape, be
certain the tape will not damage panel finish upon removal.
6. Using a 7/64" (3 mm) drill bit, drill 6 pilot holes 1/2" (12 mm) deep into the wood panel
using the holes in the door frame as a guide.
NOTE
It is important to ensure that all drilled holes are drilled to the correct depth in order to
avoid splits in the wood when hardwood is installed.
7. Locate 6 of the M4x34 mm screws provided with your unit.
8. Using a Phillips screwdriver, place one screw into each of the 6 pilot holes and screw
down as in Fig. C. Do not overtighten screws.
9. Ensure the screws sit flush against the bottom of the channel. Remove the clamps from
the door.
NOTE
If a panel requires additional adjustment after removing clamps, slightly loosen each
screw and adjust the panel as necessary. Tighten screws upon completion.
10. Starting at the corners, re-install the gasket into the gasket channel in the frame. Make
sure the gasket is fully seated.
Fig. A
Dacor_BRW5500D_IM_EN.indd 33
Fig. B
Bar Clamp
Door/Drawer
Wood Panel
Fig. C
English 33
2024-06-13
4:31:42

Publicité

loading