Operation; General - Hatco Glo-Ray 2-Go GRS2G Série Manuel D'installation Et D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

English
Floor Flange Installation
Use the following procedure to secure a unit to the floor using
the floor flanges. GRS2G-3920-2 and GRS2G-3920-3 models
can be secured to a countertop using this procedure.
1. Verify that the desired installation location will work for
securing the unit.
2. Determine the appropriate fasteners (not supplied) for
proper installation based on the flooring/countertop
material.
3. Secure the unit to the floor/countertop using the appropriate
fasteners through the floor flanges.
• The floor flanges are adjustable for leveling the unit
before securing to the floor/countertop.

General

Use the following procedure to operate Glo-Ray 2-Go
Heated Shelves. Each shelf can be controlled and monitored
individually using the touchscreen controller.
WARNING
Read all safety messages in the IMPORTANT SAFETY
INFORMATION section before operating this equipment.
Startup
1. Plug the unit into a properly grounded electrical receptacle
of the correct voltage, size, and plug configuration. See
the SPECIFICATIONS section for details.
2. Move the Power I/O (on/off) switch to the I (on) position.
• The
heating
elements
energize.
• The touchscreen controller will
energize and show the Home
Screen. The Home Screen shows
the current temperatures that
correspond with the position of
each shelf on the unit.
Form No. GRS2GM-0520
will
°
150
F
°
150
F
°
150
F
°
150
F
7
Floor Flanges
2-1/2" (64 mm)
35-5/8" (905 mm)
Floor Flange Installation
CAUTION
BURN HAZARD: Some exterior surfaces on unit will get
hot. Use caution when touching these areas.
3. Allow the unit 15–20 minutes to reach operating
temperature before loading the shelves with pre-heated
food product.
NOTE: The controller is pre-set at the factory with each shelf
temperature at 150°F (66°C).
4. Refer to the "Changing the Temperature Settings"
procedure in this section to change the shelf temperature,
if necessary.
Shutdown
1. Move the Power I/O (on/off) switch to the O (off) position
and allow the unit to cool.
2. Perform the "Daily Cleaning" procedure in the
MAINTENANCE section of this manual.
INSTALLATION

OPERATION

Publicité

Chapitres

Table des Matières
loading

Table des Matières