Maintenance; Maintenance Schedule - Husqvarna K 1270 II Manuel D'utilisation

Masquer les pouces Voir aussi pour K 1270 II:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

d) Put the cutting blade against the rail and make
sure that it is in the center of the cut. If it is
necessary, adjust the fixture attachment bushing.
e) Continue to cut.
6. Complete the cut.
7. Stop the product.
8. Remove the product from the rail fixture.
Introduction
WARNING:
safety chapter before you do maintenance
on the product.
For all servicing and repair work on the product, special
training is necessary. We guarantee that professional
repairs and servicing is available. If your dealer is not a
Clean
1631 - 001 - 04.05.2021

Maintenance

Read and understand the
Daily
External cleaning
Cold air intake
9. Remove the rail fixture from the rail.
To cut rail, recommendations
Note:
With correct cutting technique, the time to cut a
50 kg/m rail is 1 minute and to cut 60 kg/m rail is 1.5
minute. If more time is necessary, do a check of the
cutting technique and the cutting blades. Incorrect
cutting technique causes problems, such as cuts that
are not accurate. An incorrect, blunt or worn cutting
blade can also cause cuts that are not accurate.
To get accurate cuts, only use high quality cutting
blades that are made specially to cut rail.
To make straight cuts, start with these steps:
1. Apply full throttle until the blade is at full
speed.
2. Decrease the throttle and keep it below the
speed limit until the cutting blade is stable
with no vibrations.
3. Start to cut.
4. Apply full throttle and keep full speed until
the cut is completed.
Hold the product handle with your hands aligned with
the cutting blade. This gives a straight cut and
decreases the wear on the cutting blade.
For the best result and a straight cut, install the
power cutter with its right side to the fixture.
service agent, speak to them for information about the
nearest service agent.
For spare parts, speak to your HUSQVARNA dealer or
service agent.

Maintenance schedule

The maintenance schedule shows the necessary
maintenance of the product. The intervals are calculated
on daily use of the product.
Weekly
Monthly
Yearly
Spark plug
Fuel tank
27

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

K 1270 ii railK 1270 smartguard

Table des Matières