3.4 CE marking
The CE marking shows that the products
comply with the basic requirements of the
applicable directives as stated on the de-
claration of conformity.
The declaration of conformity can be
viewed at the manufacturer's site.
4 Set-up
4.1 Checking the scope of delivery
Quantity Designation
1
Product
Operating and installation in-
1
structions
Bag containing fixing material
1
(2 bolts, 2 wall plugs, 3 seals, 1
special fixing screw)
1
G 1/2" cold water connector
with a cold-water isolation valve
1
G 1/2" domestic hot water con-
nector
2
Double nipple
1
12 l/min flow rate limiter
1
Strainer for the cold water inlet
1
Mounting plate
1
Mounting template
4.2 Selecting an installation
location
▶
Install the product as close as possible
to the draw-off points that are used
most frequently.
Note
The product may also be in-
stalled above baths or in a
shower area.
0020288451_00 electronicVED Installation instructions
4.3 Installation clearances
E
D
C
≥ 50 mm
A
≥ 50 mm
B
≥ 120 mm
C
The bottom section of the product (D) must
be level with the product's bearing area on
the wall;.
4.4 Installing the product on the
wall
4.4.1 Dimensions
35
35
6
100
1
Top grommet
2
Central attach-
ment
3
G 1/2" domestic
hot water con-
nection
Set-up 4
A
B
B
C
≥ 130 mm
D
≤ 22 mm
E
19
1
2
16
3
4
5
100
240
4
G 1/2" cold wa-
ter connection
5
Bottom grommet
6
G 1/2" outside
thread
35