Télécharger Imprimer la page

VOGELZANG VG2020E-P Manuel D'utilisation Et D'instructions page 4

Publicité

FOR CUSTOMER SERVICE CALL: 800-750-2723 EXT 5050
TOOLS AND MATERIALS
You will need a drill with a 1/8" bit to install sheet metal
screws into connector pipe. A 5/16" socket/wrench or
screw driver to install the room air deflector, and blower
assembly described. A 1/2" socket/wrench to install flue
collar. A non-combustible floor protector as specified in this
manual. All chimney and chimney connector components
required for your particular chimney installation. For
mobile home/transportable buildings see the "For Use
In Mobile Home/Transportable Buildings" section of this
manual.
BLOWER ASSEMBLY
The blower assembly must be disconnected from
the source of electrical supply before attempting the
installation. The blower assembly is intended for use only
with a stove that is marked to indicate such use. Do not
route the supply cord near or across hot surfaces! Fix the
assembly to the back of the stove with the four screws
provided.
© 2024 United States Stove Company
ASSEMBLY INSTRUCTIONS
ASH PAN ASSEMBLY
Remove ash pan from firebox. Under the firebox, there are
two brackets; Slide the ash pan into these brackets.
FLUE COLLAR ASSEMBLY
Mount the flue collar to the top of the unit as shown using
the (3) 5/16-18 x 1-1/2 bolts, (3) washers, and (3) weld
tabs provided in the parts box.
4
5/6-8 x 1-1/2 BOLT
WASHER
GASKET
HEATER TOP
WELD TAB

Publicité

loading

Ce manuel est également adapté pour:

Vg2020e-lVg2020e-bpVg2020e-blVg2020e-w