Télécharger Imprimer la page

Sime Kit Hybrid Mode D'emploi page 42

Publicité

2.2
Electrical connections
The electrical connections, to be made by an authorised company
or by professionally qualified personnel
diagram below.
L
N
PMI
CN11
BLUE
1 = COM 2
2 = NC 2
3 = NO 2
1 = COM 1
SC1
2 = NC 1
3 = NO 1
Live
L
Neutral
N
System delivery sensor
SMI
SE
External sensor
Room thermostat
TA
Safety thermostat (low-pressure system)
TSbt
Connections to be made to the BOILER:
– TA (Room thermostat)
– SE (External sensor)
– SMI (System delivery sensor)
– PMI (System delivery pump)
NOTE:
if a boiler with modulating pump is used, the return sensor
from the boiler's terminal board (terminals 1-2) must be
disconnected and the SMI sensor of the
connected to it.
42
, are summarised in the
BROWN
BLUE
CN12
CN13
F
SC2
TRA
7 6 5 4 3 2 1
must be
Hybrid Kit
Before carrying out the operations described below:
– Set the system's main switch to "OFF".
– Close the gas valve.
CN15
CN14
CN3
CN5
CN6
CF
System delivery pump
PMI
Heat Pump
PDC
Two-relay board
SC1
SC2
Boiler board
Flat cable
CF
To connect the "TA" remove the jumper between
terminals 5 and 6.
Connections to be made to the Heat Pump:
– SC1 (Two-relay board)
a
ATTENTION
Attach the warning label, included with the supply, on the
boiler in a clearly visible position.
SMI
GREEN
1
GREEN
2
BLUE
3
SE
BLUE
4
BLACK
5
BLACK
6
TA
PDC
(INLET
ON/OFF REMOTE)
- PDC SHP ECO EV
(Terminals 15.1 - 15.2)
- PDC SHP M PRO
(Terminals HT - COM (CN31))
EN
TSbt
Fig. 7

Publicité

loading

Produits Connexes pour Sime Kit Hybrid

Ce manuel est également adapté pour:

8114500