INSTALLING THE COOKING GRIDS:
Parts Required:
3 x #24 Cast Iron Grids
1 x #25 Porcelain Upper Grid
Installation:
Your LG Elite 800 Series Smoker comes complete
With three (3) Cast Iron Cooking Grids, #24 and
One (1) Porcelain Upper Cooking Grid, #25 for the
upper cooking rack.
NOTE: To maintain the searing and grilling performance of
your grid, as well as their longevity, some special care and
maintenance is required. (refer to maintenance section)
INSTALLING THE MAIN LID HANDLE:
Parts Required:
Large Phillips Screwdriver or
Phillips Drive Bit and Drill
Installation:
Insert one screw through the hole provided in the barrel hood.
Install the cardboard washer, then metal bezel on the screw end
sticking through the barrel.
Hand thread and tighten this screw to one of the ends of the one
piece stainless steel handle.
Follow the same procedure to secure the other end of the handle to
the barrel.
Using a Phillips screwdriver, firmly tighten both bolts until handle
feels firm.
CAUTION!
DO NOT OVERTIGHTEN! Only a snug fit is required.
INSTALLING THE DOME THERMOMETER:
Parts Required:
Installation:
The thermometer comes complete with its own threaded nut already
installed on the thermometer.
Simply spin off the threaded nut and small washer.
Insert the dome thermometer, thru the large bezel and protective felt, before
inserting through the hole provided in the top of the hood.
Then firmly hand tighten the nut back onto the thermometer.
NOTE: Do not tighten by spinning the head of the thermometer.
14
Assembly Instructions
2 x
Multi Head Screws (AA)
2 x
Bezel—Decorative Washer
2 x
Felt Washers
1 x
Stainless Steel Handle
Dome Thermometer
Large Protective Felt
Large Bezel—Decorative Washer
Washer and 9/16" Nut
Bolt
14