Installation Guide
Installation Work Flow
Follow the procedures below to mount the projector on a wall.
a
Installing the Setting Plate and the Projector (
b
Adjusting the Projected Image (
c
Calibrating the Interactive Pen (
When installing the Touch Unit, finish installing the projector first, and then follow the procedures below.
a
Installing the Touch Unit (
b
Adjusting the Angle of Laser Diffusion (
c
Performing Touch Calibration (
p.23)
s
p.34)
s
p.41)
s
p.47)
s
p.51)
s
p.62)
s
8