All manuals and user guides at all-guides.com
Secure the Bath to the Framing (cont.)
Install large-head roofing nails or other large-head fasteners over the top of the flange at each stud
location to pin the flange to the studs as shown.
Make sure the fastener heads will not interfere with the installation of the wall surrounds or
finished wall material.
1021859-2-E
10
Sterling