Télécharger Imprimer la page

Hitachi NT 32AE2 S Manuel D'instructions Et De Sécurité page 19

Masquer les pouces Voir aussi pour NT 32AE2 S:

Publicité

3. WARNING LABEL
Do not use the Nailer with missing or damaged
WARNING LABEL.
A new WARNING LABEL is available from a Hitachi
authorized service center.
4. Maintenance chart (See page 19)
5. Operator troubleshooting (See page 20)
6. Service parts list
A: Item No.
B: Code No.
C: No. Used
D: Remarks
CAUTION
Repair, modifi cation and inspection of Hitachi Power
Tools must be carried out by a Hitachi Authorized
Service Center.
This Parts List will be helpful if presented with the
tool to the Hitachi Authorized Service Center when
requesting repair or other maintenance.
In the operation and maintenance of power tools, the
safety regulations and standards prescribed in each
country must be observed.
Maintenance chart
ACTION
Drain air line fi lter daily.
Keep lubricator fi lled.
Clean fi lter element and blow air
through fi lter in direction opposite to
normal fl ow daily.
Clean magazine and feeder
mechanism.
Keep push lever working properly.
Lubricate the Nailer after nailing.
Drain air compressor daily.
MODIFICATIONS
SERVICE AND REPAIRS
Warning
label
All quality Nailers will eventually require servicing or
replacement of parts because of wear from normal use.
NOTE: Specifi cations are subject to change without any
WHY
Prevent accumulation of moisture
and dirt.
Keep the Nailer lubricated.
Prevent clogging of fi lter with dirt.
Prevent a jam.
Promote operator safety and effi cient
Nailer operation.
Extend the Nailer life.
Keep the Nailer operated properly.
Hitachi Power Tools are constantly being improved
and modifi ed to incorporate the latest technological
advancements.
Accordingly, some parts (i.e. code numbers and/or
design) may be changed without prior notice.
WARNING
● Only service personnel trained by Hitachi,
distributor or employer shall repair the Nailer.
● Use only parts supplied or recommended by
Hitachi for repair.
obligation on the part of HITACHI.
Open manual petcock.
Fill with Hitachi pneumatic tool
lubricant.
Follow manufacturer's instructions.
Blow clean daily.
Blow clean daily.
Supply 5 – 10 drops of lubricant into
the Nailer.
Open petcock on air compressor
tank.
English
HOW
19

Publicité

loading

Ce manuel est également adapté pour:

Nt 50ae2 s