Maintenance; Checklist Maintenance; Inspection After Relocation - Prepare For New User; Checklist - After Relocation - Invacare Etude Plus HC Manuel D'utilisation

Masquer les pouces Voir aussi pour Etude Plus HC:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Invacare® Etude Plus® HC

6 Maintenance

6.1 Maintenance
A service contract can be made in the countries, where
Invacare® has its own sales company. In certain countries
Invacare®offers courses in service and maintenance of the
bed. Spare parts lists and additional user manuals are
available from Invacare®.
With normal daily use, service must be carried out according
to the check list after two years use and thereafter every
second year.
IMPORTANT!
– The mattress support must be supported
during service inspections, to prevent accidental
lowering.
– Only personnel who have received the
necessary instructions or training may perform
service and maintenance of the bed.
– After reconditioning the bed, or if bed functions
change, service must be carried out according
to the check list.
Before Use
Ensure that all manual and electrical parts functions
correctly and are in a secure state.
After three months
Ensure that all manual and electrical parts are
functioning, and tighten bolts, screws, nuts, etc.
Every year
We recommend a safety test comprising the motors'
performance and mechanical state.
Every second year
Service should be performed according to the check list.
Motors, hand control and control units are serviced
by exchanging the faulty part.

6.1.1 Checklist maintenance

Checkpoints
q
Visual inspection of all parts of the bed (no
deformations)
q
Circlips, cotter pins and plastic fixing ring - properly
locked and intact.
q
Screws - tightened.
q
Weldings - intact (no wear and tear)
q
Castors (rolling smoothly)
q
Castor fittings - tightened.
q
Castor brakes - locking properly.
q
All motors - running properly (with regular speed and
at low noise).
q
Wires - correctly wired and undamaged.
q
Electric plugs - undamaged.
q
Side rail locking and moving system - properly locking
and running smoothly.
q
Accessories - correctly assembled and correct function.
q
Damaged coating - repaired.
q
Leakage of grease - check for grease.
16
CAUTION!
Risk of injury or damage to property
Grease leaks can lead to accidental falls or fire.
– Contact service provider if leaks of grease or
other residue is detected.
6.2 Inspection after relocation - Prepare for
new user
IMPORTANT!
When the bed has been relocated; before given
to a new user it has to be thoroughly inspected.
– Inspection must be done by a trained
professional.
– For regular maintenance see maintenance chart.

6.2.1 Checklist - After relocation

Checkpoints
q
Check that the inserts connecting the two mattress
support halves are fully inserted and locked.
q
Check that the mattress support is correctly mounted to
the bed ends and that the locking ring is engaged.
q
Check the locking of the motors (pipe pins correctly
mounted).
q
Check the electronic wiring for the motors (wires not
squeezed).
q
Check that the enclosing of the motors are intact (no
cracks that enables fluids to pierce).
q
Check that the locking cam is properly mounted over
the contacts in the control box.
q
Check the sections of the mattress support by using
the hand control to activate all functions of the moving
parts.
q
Check the function of the brakes.
q
Check the locking function(s) of the side rails.
q
Check that all bed slats are intact and not loose.

6.3 Cleaning and disinfection

IMPORTANT!
Wrong fluids or methods can harm or damage
your product.
– Follow instructions carefully for either
Non-washable or Washable components.
– Never use corrosive fluids (alkalines, acid,
cellulose thinner, acetone etc)
– Never use a solvent that changes the structure
of the plastic or dissolves the attached labels.
– Always make sure that the bed is carefully dried
before taking it into use again.

6.3.1 Cleaning methods

Electrical components
IMPORTANT!
Non-washable electronics can not withstand high
temperatures.
– Do not wash or dry in higher temperatures
than 40 °C.
Method: Wipe off with a wet cloth or soft brush.
Max. temperature: 40 °C
Solvent/chemicals: Water
1579562-B

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Etude plusEtude plus low

Table des Matières