Adjusting The Air-Blast Unit En; Establishing The Electrical Connection En - Abicor Binzel BRS-LCi VW Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

BRS-LCi VW
6.6.2 Adjusting the air-blast unit
1 Switch Y3.
2 Adjust the quantity of blast air by means of the adjusting screw (3).
3 Disconnect Y3.
6.7 Establishing the electrical connection
Four robot outputs 24 V DC and two robot inputs are required for controlling the valves.
Fig. 9
Clamped gas nozzle
-X1.18 SW/BK
Stroke down
SW/BK
-X1.17
Air blast
-X1.16
BN
Injection
BN
-X1.15
Lift up
BN
-X1.14
Motor on / clamp
BN
-X1.13
BN
-X1.12
BN
-X1.11
BU
-X1.10
BU
-X1.9
BU
-X1.8
-X1.7
BU
-X1.6
BU
-X1.5
BU
-X1.4PE
-X1.3PE
-X1.2PE
-X1.1PE
Establishing the electrical connection
6 Putting into operation
BN
A1
A2
BU
BN
A1
A2
BU
BN
A1
A2
BU
BN
A1
A2
BU
EN - 11

Publicité

Table des Matières
loading

Table des Matières