Télécharger Imprimer la page

KitchenAid 720-0819G US Instructions D'installation Et Guide D'utilisation Et D'entretien page 30

Gril à gaz extérieur à 2 brûleurs avec brûleur

Publicité

Make Gas Connection
1.
A combination of pipe fittings must be used to connect the
grill to the existing gas line.
The 3.05 m (10 ft.) PVC flexible gas supply hose
design certified by CSA must be used.
Pipe-joint compounds suitable for use with Natural
gas must be used. Do not use Teflon®† tape.
There must be a certified manual shut-off valve in the
gas supply line near the grill for easy access.
2.
Connect the brass connector on one end of the 3.05 m (10
ft.) PVC flexible gas supply hose to the Natural gas
pressure regulator.
3.
Connect the quick connector on the other end of the 3.05
m (10 ft.) PVC flexible gas supply hose to the rigid Natural
gas supply pipe.
† ®TEFLON is a registered trademark of Chemours.
Change Grill Main Burner Valve Orifices
1.
Remove the grates and flame tamers.
2.
Remove the cotter clip that hold the burner in place. Set
the clip aside.
3.
Remove the burner from the grill by lifting the burner out.
4.
Use a 6 mm socket and wrench or 6 mm nut driver to
remove the LP brass orifice from the end of gas valve. The
main burner NG orifice is located behind the LP orifice, so
no additional orifice needs to be installed.
A.
IMPORTANT: Check that the LP orifice is properly
removed inside of the burner opening.
29
Main burner orifice
A

Publicité

loading

Ce manuel est également adapté pour:

1500299