Unpacking And Placing - KERN and SOHN KFA_V20 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6.2 Unpacking and placing

Unpacking:
Remove weighing beams and accessories carefully from packaging, remove
packaging material and place device at the planned work place. Verify that there has
been no damage and that all packing items are present.
Scope of delivery:
2 Weighing beams with fitted "mains lead display screen" and "connecting cable
weighing beams".
4 weighing cell feet
Operating instructions
Placing:
 Prior to the final placing, install the four weighing cell feet.
 Ensure a level surface on the installation site, particularly around the weighing cell
feet.
 Put down the weighing beams and check whether they are positioned level and
that all four feet reach the floor. Adjust minor height differences by adjusting the
weighing cell feet.
 For this purpose remove the cap head screw (See chapter 2, item
the height of the 4 weighing cells by turning the adjusting screw. For this purpose
use an external levelling appliance, e.g. a water level.
 Make sure not to crimp or damage the mains lead and connecting cable when
lifting or placing.
8
) and adjust
KFA V20-IA-e-1714

Publicité

Table des Matières
loading

Table des Matières