table of contents
EN
1.0
general information
1.1
rates and efficiencies
1.2
installation checklist
1.3
installation overview
1.4
rating plate information
1.5
mobile home installation
1.6
dimensions
2.0
venting requirements
2.1
typical vent installation
2.2
special vent installations
2.2.1 periscope termination
2.2.2 corner termination
2.3
minimum air terminal location
clearances
2.4
venting application flow chart 16
2.5
definitions
2.6
elbow vent length values
2.7
top exit horizontal termination 18
2.8
rear exit horizontal termination 20
2.9
top and rear exit vertical
termination
2.10
rear exit
2.11
rear exit shield (for rear vent only)
2.12
top exit
3.0
rough framing
3.1
minimum framing dimensions 28
3.2
minimum enclosure clearances 29
4.0
venting installation
4.1
horizontal installation
4.2
vertical installation
4.3
using either flexible or rigid vent
components
4.3.1 horizontal air terminal installation
4.3.2 vertical air terminal installation 38
4.3.3 appliance vent connection
4.3.4 horizontal air terminal installation
4.3.5 vertical air terminal installation 40
4.4
vertical through existing chimney
4.4.1 restricting vertical vents
note:
The information throughout this manual is believed to be correct at the time of printing. Wolf Steel Ltd. reserves
the right to change or modify any information within this manual at any time without notice. Changes, other than
editorial, are denoted by a vertical line in the margin.
4
W415-2881 / C / 03.07.22
5
5.0
electrical information
5
5.1
electronic wiring diagram
6
5.2
battery back-up installation
6.0
gas installation
7
7.0
operation (electronic)
9
9
7.1
pilot-on-demand
8.0
operation (millivolt)
10
11
9.0
finish framing
12
9.1
minimum framing dimensions 49
10.0
finishing
14
14
10.1
safety barrier / door removal and
14
installation
10.2
front hood installation
15
10.3
non-combustible facing material
17
10.4
minimum mantel clearances
17
10.5
recessed installation
10.6
log placement
10.7
glowing embers
10.8
charcoal embers
22
10.9
logo placement
11.0
optional blower installation
24
12.0
adjustment
25
12.1
pilot burner adjustment
26
12.2
venturi adjustment
27
12.3
flame characteristics
13.0
maintenance
13.1
annual maintenance
34
13.2
door glass replacement
35
13.3
care of glass
14.0
replacement parts
36
14.1
overview
37
14.2
millivolt valve train assembly
14.3
electronic valve train assembly 68
15.0
accessories
37
16.0
troubleshooting (electronic)
17.0
troubleshooting (millivolt)
38
18.0
warranty
39
41
42
43
43
44
45
46
47
48
49
50
50
51
52
53
54
55
58
58
58
59
60
60
60
61
62
63
64
64
65
66
67
69
70
73
75