Télécharger Imprimer la page

ISE SY-2027 Manuel De L'utilisateur page 22

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 1
Note: the pedal shield should be geared tothe needs of frame.
With two flat pad and M8*20 mm bolt foot pedals,with M8 bolts (20) lock finally stop
lever (17)complete the installation.
STEP 6:
1, to protect the tank side of rubber plug;
2,will be loaded containers of water areplaced
at the rowing machine, electricpump hose
inserted into the water at thebottom of the
container, metal hose insertedat the end of the
first water tank, press theswitch button at the
top of the water injection(as shown),
3, after water injection to a desired level,and
then press the button to close theelectric
pumps, (do not exceed the highestwater level)
4, good will water tank of the rubber plugto
plug, water injection.
Note: it is recommended to use pure water,pure water, generally a year or so to replace,tap
water change in about half a year.
Pumping: electric pump hose inserted at thebottom of the tank,as shown
STEP 5: ASSEMBLE THE FOOT PEDALS
This step to prepare two flat pad diagram(12),
a spring (13). two road plate (14) (15).Foot
road tube (16) stop lever (17)。M8socket head
bolts 2 (30), and the M8gasket 2 (31),and
Pacific Oceanhexagonal wrench 2 (32)
The two foot pedals tube inserted into the
frame.Connect the two flat gasket to tube feet
road,will be installedspring stop lever, inserted
into the frame casing, connect the two road-
plate to foot pedals on the pipe.
9
EN

Publicité

loading